
Color Block 2 User Manual 7 V1.1 September 2012
2. Then slide the fixtures together so that they are aligned correctly, taking care to get past the extended catch plate.
Note: This will be stiff on new fixtures and a twisting action may ease assembly.
3. Finally use the butterfly latch to secure the fixtures together tightly (max 5 units together).
Note: It is important to ensure adequate ventilation to the rear of all Color Block fixtures. Never place the fixtures directly on
the floor pointing upwards when configured as a batten.
The Color Block 2 fixture is supplied with an integral M10 clinch nuts at each
end. These can be used to attach the Color Block 2 fixture to a standard hook
clamp.
Note: damage may occur if the bolt is too long. (M10x16 maximum)
b. Batten bracket kit for up to five fixtures
The batten bracket set is supplied as a pair of brackets with fibre washers and thumb wheels.
The batten bracket set can be used for floor mounting (see photo), direct wall mounting and
truss mounting when used in
conjunction with hook clamps or half couplers.
Comentarios a estos manuales